The Village Family Service Center

Road construction to hamper traffic around Village's Fargo office

Date: 
Friday, August 25, 2017

Major road construction to replace the intersection of 13th Avenue South and 25th Street near The Village’s main Fargo office will affect traffic from Sept. 11 into November, according to the City of Fargo.

While one lane each direction will remain open – and access to The Village will be maintained at all times – clients may want to detour to avoid that intersection. Alternate routes are detailed below the map:

City of Fargo map detailing intersection replacement at 13th Avenue and 25th Street.

  • If coming from the west (eastbound on 13th Avenue South): Turn left on either 28th Street (by Don’s Car Washes) or 27th Street (by Sanford Children’s). Take a right on 12th Avenue South, and turn right to enter our parking lot.
  • If coming from the east (westbound on 13th Avenue South): Turn right on 23rd Street and proceed to 9th Avenue South. Take a left at the stop sign, then a left at the stoplight. Go south to 12th Avenue South, then turn right.
  • If coming from the south (northbound on 25th Street): Turn left on 17th Avenue South and head west. Turn right on 32nd Street, and head north to 13th Avenue. Turn right (east). Then turn left on either 28th or 27th Street, and right on 12th Avenue South.
  • Drivers coming from the north (southbound on 25th Street) should not need to detour, but traffic may be backed up.

In all cases, clients should allow additional time to arrive for their appointments. The Village encourages motorists to slow down in construction zones and drive safely.